다른 언어로의 연결이 없는 문서의 목록입니다:
- 201부터 #250까지의 범위에서 50개의 결과가 아래에 보입니다.
(이전 50개 | 다음 50개) (20 | 50 | 100 | 250 | 500) 보기
- Stop-go policy
- Streamlined Specification
- String Development
- Strip Building
- Studio Apartment
- Subcontractor
- Substantial Completion
- Successful Bidder
- Superintendent
- Superintending Officer
- Supplemental Services
- Supplementary Conditions
- Surety Bond
- Suspension
- Suspension of Work
- Taking-over Certificate(TOC)
- Tax Abatement
- Tax Clearance Certificate
- Technical hitch
- Temporary Facility
- Temporary Hand-Over
- Temporary Work
- Tender Shoppping
- Termination Costs
- Termination of Contract
- Third Party Liability
- Time-Related Cost
- Time of Completion
- Topographic Survey
- Turn-Key Contract
- Two Envelopes System
- UL Label
- Underground Utility
- Usance Credit
- Valuable Consideration
- Value Engineering
- Variation Order
- Vehicle Detector System(VDS)
- Volume Method
- Waiver of Claim
- Wear and Tear
- Working Budget
- Working Drawing
- Workmen's Compensation Insurance
- Zoning permit
- “공사비”에 관급자재대 포함여부
- 가강수량(Precipitable Water Vapor)
- 가격엔지니어링(Cost Engineering)
- 가동중지(Shutdown)
- 가소제(Plasticizer)